Capacitor banks
A capacitor bank is a shunt capacitor for power factor correction. It has its own toolbar button and edit panel, and studies and sizing treat it separately from loads.
Adding a capacitor bank
- Select the bus the bank connects to.
- Click Capacitor bank in the component toolbar. EKX places the bank below the bus and wires it to the bus.
- Enter the bank's rating in the edit panel.
A bank has one terminal at the top and is placed and wired like a load. New banks are tagged CAP-001, CAP-002, and so on.
Capacitor bank properties
The two headline fields describe the rating:
| Field | Units | Default | Meaning |
|---|---|---|---|
| Rated kvar | kvar | 25 | The whole installed bank at its rated voltage and frequency |
| Rated Voltage | kV | Connected bus voltage | Follows the connected bus voltage until you enter one |
The Equipment tab holds the rest of the bank:
| Field | Range | Default | Meaning |
|---|---|---|---|
| Installed Steps | 1 to 100 | 1 | Number of steps in the bank |
| Energized Steps | 0 to the installed steps | All steps | Steps connected; 0 disconnects the bank |
| Rated Frequency | 50 Hz or 60 Hz | Project frequency | Frequency the kvar rating applies at |
| Connection | Delta, Grounded wye, Ungrounded wye | Delta | Bank connection |
| Losses | 0 to 100 W/kvar | 0 | Active-power loss; 0 models an ideal capacitor |
The Notes tab holds the Description. In service works as it does for other components.
Every edit saves immediately and is one Undo step.
Capacitor banks in scenarios
In a scenario you can change only Energized Steps and In service. The rating and the other fields belong to the base design and are disabled in a scenario. Use scenarios to compare the bank switched in, partly switched in, or switched out. See Scenarios.
How studies use a capacitor bank
Power flow analysis
Power flow models the bank as a fixed admittance. Its output is:
Q = Rated kvar × (Energized Steps / Installed Steps) × (V_terminal / V_rated)²The bank also draws a small active power of Losses × kvar. With Energized Steps set to 0 the bank gives no output.
After power flow, the bank shows its kW, kvar, current, and output as a percent of the rated output of its energized steps. When the terminal voltage is above 110% of the bank's rated voltage, the bank shows Above 110% rated V and the load flow report lists it under Overvoltage Conditions. See Interpreting power flow results.
Short circuit and arc flash
A capacitor bank contributes no fault current. Short-circuit and arc flash studies leave it out.
Harmonic study
The harmonic study models the bank as a shunt capacitor with the energized steps of each scenario. See Run a harmonic design study.
Sizing a capacitor bank circuit
Auto-sizing and Re-size system size the bank's circuit from its rated current:
I_r = Rated kvar / (√3 × Rated kV)The rated current covers all installed steps. Energized steps and scenarios do not change it.
| Equipment | Sizing rule | Source |
|---|---|---|
| Branch conductor | Ampacity at least 135% of I_r | NEC 2026 460.8; CEC 2024 Rule 26-208(1) |
| Branch breaker or fuse | Smallest standard rating at or above 135% of I_r | EKX default; NEC 460.9 and CEC Rule 26-210 require only "as low as practicable" |
| Disconnect or load-break switch in the bank branch | At least 135% of I_r | NEC 460.10(3); NEC 460.24(A)(1) above 1000 V; CEC Rule 26-214 |
The breaker or fuse rule is EKX's default, not a Code minimum. Neither NEC 460.9 nor CEC Rule 26-210 sets a minimum rating, so a lower rating you select (for example 450 A on a 360.8 A bank) is shown as below EKX's default, not as a Code failure. On a CEC project, a selected protection rating above 250% of I_r is a violation of Rule 26-210.
Example: a 300 kvar bank at 480 V has I_r = 360.84 A. 135% of I_r is 487.1 A, so EKX selects a 500 A breaker and a conductor with at least 487.1 A ampacity.
Upstream equipment
- A feeder conductor that supplies only capacitor banks needs at least 135% of the banks' summed I_r (NEC 460.8; CEC Rule 26-208(1)).
- A bus or protection device that supplies only capacitor banks is proposed at 135% of the summed I_r as EKX's default. A lower rating you select is shown as below that default, not as a Code failure. A disconnect switch that supplies only banks needs at least 135% (NEC 460.10(3) or 460.24(A)(1); CEC Rule 26-214).
- In a feeder that also supplies other loads, the banks add nothing and subtract nothing.
- A transformer that supplies only capacitor banks is sized to at least 135% of their kvar on a CEC project (Rule 26-220). On an NEC project it is not sized from the banks.
Limits
- On an NEC project above 1000 V, EKX does not auto-size the bank's conductor or protection and says: "NEC Article 460 gives no conductor or protection multiplier for capacitors above 1000 V. Select this circuit's cable and protection by hand."
- CEC rules apply at every voltage.
- A capacitor branch has no voltage-drop target.
Reports and exports
- The load flow report has a Capacitor Bank Results table.
- The equipment schedule report has a Capacitor Bank Schedule.
- The equipment schedule spreadsheet export has a Capacitor Banks sheet.
Projects with capacitor bank loads
Capacitor banks used to be a load type. EKX converted each load whose type was "Capacitor bank" into a capacitor bank with the same name, position, connections, results history, and scenario energized steps.
- A converted load that had a capacitor model keeps its rating, steps, connection, and losses.
- A converted load without a model became a bank rated at its stored reactive power (or 25 kvar if it had none), at its rated voltage and the project frequency, with a delta connection, one energized step, and no losses.
- Scenario values other than energized steps and in service were dropped.
"Capacitor bank" is no longer in the load type list. Reactor remains a load type.
Related topics
- Loads and motors - Generic loads and motors
- Understanding power flow - How capacitor banks are modelled
- OCPD sizing - Protection device sizing
- Read and change project data through the API - The
capacitor_bankcomponent type