Core Analysis

Short circuit analysis that runs itself

Calculate three-phase and line-to-ground fault currents the moment you connect a device. Duty checks happen automatically — no separate run button, no waiting.

What you get

Three-phase & L-G faults

Momentary, interrupting, and symmetrical fault current values at every bus in your model.

Automatic duty checks

Device ratings are compared against calculated fault duties instantly. Failures are flagged in real time.

IEC 60909-based method

Short-circuit calculations use PandaPower's IEC 60909 engine for facility distribution studies.

Regression-tested results

Representative commercial and industrial systems are checked against PandaPower expected-result fixtures.

Live results

Fault currents update as you edit the one-line. Change a transformer impedance and see the impact immediately.

No software to install

Runs in any modern browser. No dongles, no license servers, no IT tickets.

Export-ready reports

Generate professional short circuit study reports with a single click.

How ekx streamlines short circuit studies

Traditional tools make you build the model, configure the study, wait for results, and then check duties manually. ekx collapses all of that into one step.

  • Fault currents calculate live as you build the one-line diagram
  • Device duty checks run automatically — no separate study configuration
  • Results update instantly when you change any parameter
  • Export a professional study report in one click

Start free. Upgrade when you need more.

Free tier includes 1 project with up to 2 buses. Paid plans start at $27/month for consultants and $149/month for unlimited access.

View All Plans

Frequently asked questions

What fault types does ekx support?

Three-phase, single line-to-ground, and line-to-line faults. Momentary, interrupting, and symmetrical (steady-state) values are calculated at every bus.

Which standards does the short circuit calculation follow?

ekx uses IEC 60909-based short-circuit calculations through PandaPower. Automated tests compare representative commercial and industrial systems against checked-in PandaPower expected-result fixtures. Results still depend on the input data and should be reviewed by the engineer of record.

Can I export short circuit results?

Yes. You can export a professional short circuit study report as a PDF on paid plans. The report includes fault current values, device duty checks, and system parameters.

How accurate are the results?

ekx validates representative short-circuit calculation paths with automated regression tests against PandaPower expected-result fixtures. Results should be verified by a licensed professional engineer, as with any analysis tool.

Run your first short circuit study in minutes.

Build the one-line, get fault currents instantly. No installs, no dongles.

Start Free